Contact Us
Company switchboard:
Tel: 0757-26628346 / 26624184
Business contact:
Tel: 0757-26383338 26626190
office:
Tel: 0757-26622239
Extension: 138 / 120
Company News
Current Location:Home > News > Company News >The specific location is shown in the figure below:
Preparation: Operation Instructions:
1. Connect output cables;
2, call out WeChat small program;
3. Show the QR code and scan the code;
4. Select port and power consumption type on the screen;
5. Confirm to start using electricity;
6. Click stop after using the electricity;
7. Choose the payment method and pay; 8. Remove the output cable.
Notes:
1. The output of shore power is 380V/50H for three-phase five-wire;
2. Please ensure that the phase sequence of the access plug is consistent with the shore power output socket;
3. When the shore electricity is three-phase four-wire system, only after the ship's hull is connected with the neutral shore electricity line, the shore electricity can be connected;
4. When the ship is connected to the shore, it is strictly prohibited to close the generator for power supply. The generator can only be closed for power supply after the onshore electricity is cut off.
5. In case of emergency, please press the "Emergency stop button" directly.